Supercharged with Production Intelligence

    The All-in-One Workspace for Modern Industrial Engineers 

    Stitching is an art — we decode the science behind it. If an IE or executive isn't optimized, how can they lift worker efficiency? ProdEnhancer makes an engineer's work super simple, so better lines follow.

    30 free credits for every new IE Executive account. No credit card required.

    Watch a real method study

    See how ProdEnhancer turns a shop-floor video into motion times, standards comparison, and improvement advice.

    Built for industrial engineers in garment, textile & manufacturing. No more memorizing endless GSD, PMTS, MOST and SMV data — our AI has been trained on it for a full year.

    PMTSMTM-2MOSTGSDSMV           LEAN          ERGONOMICS

    Built for the modern shop floor

    Everything an industrial engineer needs to measure, analyze, and improve production — no spreadsheets required.

    Live Time Studies

    Capture cycle times with a precision rolling stopwatch — each tap records a lap and auto-advances to the next operation, with instant average, CV and rated SMV.

    Bottleneck & Motion Study

    Pinpoint the slowest operation in any line and break it down motion by motion to find the real cause of lost seconds.

    Smart Capacity Studies

    Compute hourly capacity, line efficiency and daily output from real measurements — for a single operation or a full production line.

    Line Balancing

    Upload your skill matrix and operation bulletin to assign operators by skill, visualize station balance and close skill gaps.

    Line Pre-setup

    Plan manpower, machines and layout for a new style before it hits the floor, with target efficiency and a readiness checklist.

    Video Motion Study

    Upload or record a production video and get an element-level Motion Analysis Scale, motion breakdown with improvement advice, MTM-2 standards comparison and an expert IE report with branded PDF export.

    Motion Analysis Scale

    Element-level motion breakdown with improvement advice and a standard comparison table you can act on.

    IE Formulas

    Every essential industrial engineering formula — SMV, efficiency, capacity, takt — with worked examples, always at hand.

    Efficiency Calculator

    World-standard efficiency math built in: (Total Produced × SMV) ÷ (Operators × Working Minutes) × 100.

    Efficiency Analytics

    Track operator and line efficiency over time with dashboards, alerts and full project history.

    Expert IE Reports

    Structured analysis written like a practical senior IE consultant — bottlenecks, gaps and actionable recommendations.

    Branded PDF Export

    Export professional, company-branded PDF reports of any study in one click.

    Excel Import & Export

    Bring existing operation data in seconds — no manual re-entry required.

    Team Collaboration

    Invite engineers, assign roles and share studies across your plant floor — no seat limits.

    Why engineers choose ProdEnhancer

    Empowering Industrial Engineers with the tools to master their own time. When you work at peak efficiency, your entire factory follows.

    • AI-generated motion analysis in under 60 seconds
    • PMTS / MTM-2 / MOST methods built-in
    • Credit-based pricing — no seat limits
    • Invite your whole team at no extra cost
    • Export professional PDF reports instantly
    • Earn credits by referring other engineers
    Expert IE Report
    Generated in 45 seconds
    Method Analysis Complete
    Video Scale Complete
    Realtime Analysis Complete
    Powerful Simplification Complete
    Recommendations Complete

    From video to insights in 3 steps

    No complex setup. No training needed. Start analyzing in under 5 minutes.

    01

    Capture

    Record cycle times live with the video stopwatch, or upload a production video.

    02

    Analyze

    Our AI engine breaks the cycle into pickup, position, sew, reposition and dispose phases — benchmarked against PMTS / MTM-2 / MOST standards.

    03

    Improve

    Not only motion, get an expert IE report with the bottlenecks, gaps and actionable recommendations.

    Motion Analysis Scale

    Pickup
    Position
    Sew
    Re…
    Dispose
    0s7.4s14.7s22.1s29.4s
    Value-Added (Keep)
    Transition (Optimize)
    Waste (Eliminate)

    A 29.4-second waistband-attach cycle, measured against the MTM-2 short-cycle attach standard.

    0:06 / 0:29
    Value-Added (Keep)
    Transition (Optimize)
    Waste (Eliminate)
    Motion Breakdown & Improvement Advice
    Pickup
    0.0s - 5.3s18%
    Get parts from bundle, align edges (18% of cycle)
    Maintain 18% pickup — keep parts within normal work area, both-hand simultaneous get
    Position
    5.3s - 11.8s22%
    Place under presser foot, align to guide (22% of cycle)
    Heavy alignment (22%) — add folder/edge guide/laser, fixture jig to cut PMTS POSITION class C→B
    Sew
    11.8s - 20.6s30%
    Machine sewing — VALUE ADDED (30% of cycle)
    Low value-add (30%) — too much non-sewing work. Target ≥45% via method redesign / attachments
    Reposition
    20.6s - 23.5s10%
    Lift foot, turn fabric, realign (10% of cycle)
    Reposition at 10% — within MOST tolerance, ensure knee lift used
    Dispose
    23.5s - 29.4s20%
    Cut thread, set aside, bundle (20% of cycle)
    Dispose at 20% — auto trimmer + drop-chute keeps this lean
    Per-study breakdown derived from MTM-2 short-cycle attach element • cycle variability 0% • machine: Kansai - WB Setter
    Standards Comparison
    MTM-2 Short-Cycle Attach Standard
    Within standard tolerance
    Phase
    Derived
    Standard
    Δ
    Pickup
    18%
    20%
    -2 pp
    Position
    22%
    20%
    +2 pp
    Sew (Value-Add)
    30%
    30%
    0 pp
    Reposition
    10%
    10%
    0 pp
    Dispose
    20%
    20%
    0 pp
    Deviations within ±5 pp of the standard are considered OK

    Trusted by shop-floor engineers

    Join teams already improving their line efficiency with ProdEnhancer.

    "ProdEnhancer cut our time-study reporting time by 80%. The AI analysis reads like a senior IE wrote it."

    Mahmudul Hasan
    Mahmudul Hasan
    Production Manager, Knit Garments Ltd.

    "Finally, a tool that speaks the language of industrial engineers. The credit system makes scaling easy."

    Sharmin Akter
    Sharmin Akter
    Senior IE Executive, Textile & Apparel Group

    "We onboarded 12 engineers in a day. No complex licensing — just invite and go."

    Daniel Weber
    Daniel Weber
    Industrial Engineer, Automotive Components Supplier

    Simple, credit-based pricing

    Start free. Upgrade only when you need more AI analysis power.

    MonthlyYearly Save up to 30%

    Free

    $0/forever

    Standard Industrial Engineering access

    • 30 free credits once
    • Live time & capacity studies
    • Excel import & export
    • Basic motion analysis
    Get started

    Standard

    $11/mo

    IE/Work Study Executive (Individual)

    • 100 credits / month
    • Professional IE Certification
    • Advanced AI IE analysis
    • Personal production setup
    Subscribe Standard
    POPULAR

    Pro

    $29/mo

    Industrial Engineer (Team Plan)

    • 250 credits / month
    • Pro Certification & Featuring
    • Team collaboration (Add members)
    • Shared production studies
    • Priority AI analysis queue
    Go Pro

    Enterprise

    from$98/mo

    Factories & multi-line operations (Custom)

    • From 1000+ credits / month
    • 15 Limited team seats
    • Custom onboarding & training
    • Dedicated support & SLA
    • Custom integrations on request
    • Custom white label available
    Get Enterprise

    Frequently asked questions

    Everything you need to know before getting started.

    Ready to supercharge your IE workflow?

    Bridge the gap between art and science. Make yourself productive first, then transform your shop floor.

    30 free credits. No credit card required.